Hotline: +49 (0) 69 94 74 15 - 0

Passavant Energy & Environment received Final Acceptance Certificate for WTP Sibiu South

10.07.2017 01:03
by PASSAVANT Energy & Environment (FD)
(comments: 0)

PASSAVANT Energy & Environment GmbH is pleased to announce in 2017 the Final Acceptance of WTP Sibiu. The project was successfully executed on a turnkey basis. Passavant re-built the WTP Sibiu based on a modern technology that took into account all the raw water quality parameters, and that ensured to the consumers a drinking water within the normal limits of all parameters provided by Directive 98/83/EEC on drinking water for human consumption.

The Project included the following works:
Design, construction, supply, installation and commissioning of Sibiu South Drinking Water Treatment Plant; Installation of a new supply main for supplying drinking water to Cisnadie locality; Rehabilitation of existing reservoirs in Cisnadie locality; Installation of a new supply main for supplying water to the Water Reservoirs from Cisnadioara to Rasinari; Construction of Water Reservoirs for Cisnadioara and Rasinari localities;

GENERAL INFORMATION

  • Project: Sibiu South WTP
  • Client: S.C. APA-CANAL S.A. Sibiu
  • Location: Sibiu, Romania
  • Flow Capacity: 34,500 m³/d, Population: 100,000 P.E.
  • Commissioning: January 2016
  • Provisional Taking Over: June 2016
  • Operation & Maintenance: 12 month
  • Final Acceptance: June 2017

Go back

© Copyright PASSAVANT Energy & Environment GmbH - All rights reserved - info@passavant-ee.com
German English