Adiyaman, Turkey

Adiyaman, Turkey
Municipal wastewater treatment, Adiyaman, Turkey – Capacity: phase 1: 185.119 EW / phase2: 252.190 EW
Process design, delivery and commissioning of the mechanical and electrical equipment for a wastewater treatment plant incl. sludge treatment.
Sludge load: phase 1: 11.558 Kg/d
phase 2: 15.844 Kg/d

Sludge Treatment Technology: pre-fermentation, static pre-thickening of the raw sludge; mechanical dewatering of excess sludge by belt thickeners; anaerobic sludge digestion; sludge dewatering centrifuges with measuring and control technology.

Award of Contract: 04/2013
Status: ongoing project