Hotline: +49 (0) 69 94 74 15 - 0

Kassel, Germany

Kassel, Germany

Municipal wastewater treatment plant incl. Sludge treatment Kassel, Germany – Capacity 335.000 EW
Process design, delivery and commissioning of the mechanical and electrical equipment for a wastewater treatment plant incl. sludge treatment.
Sludge load: 12.800 Kg/d
Sludge Treatment Technology: sludge mixer; sludge heating by means of a double-pipe heat exchanger; loading and circulation pumps; piping system for sludge, gas, water and heating operation; special parts-digester.

Award of Contract: 07/2012
Status: ongoing project

Go back

© Copyright PASSAVANT Energy & Environment GmbH - All rights reserved - info@passavant-ee.com
German English