Hotline: +49 (0) 69 94 74 15 - 0

Shanghai Bailonggang, China

Shanghai Bailonggang, China

Sludge treatment plant, Shanghai Bailonggang, China – Capacity: 4.333.333 EW

Process design, delivery and commissioning of the mechanical and electrical equipment for a wastewater treatment plant incl. sludge treatment.
Sludge load: 204.000 Kg/d

Sludge Treatment Technology: mechanical thickening of excess sludge by centrifuges; anaerobic sludge digestion in 8 egg-shaped digesters a 12,400 m³; double-pipe heat exchangers and heat for sludge drying; odour control system (3 bio filter plants)

Award of Contract: 09/2008
Status: commissioned in 2011

Go back

© Copyright PASSAVANT Energy & Environment GmbH - All rights reserved - info@passavant-ee.com
German English