Hotline: +49 (0) 69 94 74 15 - 0

Shijiazhuang, China

Shijiazhuang, China
Municipal wastewater treatment plant incl. sludge treatment – Capacity: 2.100.000 EW

Joint venture with Bilfinger Berger for the Process design, construction, delivery and commissioning of a sludge treatment and energy cogeneration plant.
Sludge load: 170.000 Kg/d

Sludge Treatment Technology: anaerobic digestion; sludge pre-thickening by belt presses; sludge dewatering using centrifuges; sludge storage silos; 3 CHP energy recovery units.

Award of Contract: 12/2002
Status: commissioned in 2006

Go back

© Copyright PASSAVANT Energy & Environment GmbH - All rights reserved - info@passavant-ee.com
German English