Hotline: +49 (0) 69 94 74 15 - 0

Zellinger Becken, Germany

Zellinger Becken, Germany
Municipal wastewater treatment plant incl. Sludge treatment Zellinger Becken, Germany
– Capacity: 25.000 EW

Process design, delivery and commissioning of the mechanical and electrical equipment for a wastewater treatment plant incl. sludge treatment.
Sludge load: 12.000 Kg/d
Sludge Treatment Technology: heating with double-pipe heat exchanger; loading and circulation pumps; piping system for sludge, gas, water and heating operation; special parts, digester; CHP unit

Award of Contract: 03/2012
Status: commissioned in 2014

Go back

© Copyright PASSAVANT Energy & Environment GmbH - All rights reserved - info@passavant-ee.com
German English